
Preparing for Stability
A look at the job site before construction began. The area is prepped and ready for the installation of helical piers to create a stable foundation for the future drive bridge.

Precision Installation in Action
A snapshot of the installation process, where helical piers are driven into the ground using hydraulic torque equipment. The team ensures each pier meets the required depth and load capacity.

The First Step to Support
The first set of helical piers installed on Mill Street. These piers will anchor the bridge into stable soil, ensuring a strong and reliable foundation.

Anchored and Ready
The helical piers, now fully installed and capped, are ready to support the drive bridge. This crucial step ensures long-term durability and structural stability.