Videos

Shotcrete Soil Nail Progress Reno Student Housing

This a time lapse showing the progress for the soil nail wall we are constructing across the street from Lawlor Events Center.  These concrete walls are being installed to make the vertical slopes safe for construction to proceed. Walls are being installed free form less than 1" from the finish building line.

our service area

We serve the following areas

NevadaCalifornia Our Locations:

Madole Construction
18300 Joy Lake Rd
Washoe Valley, NV 89704
1-775-332-0700
Madole Construction service area
Service Area
Free Estimate