Concrete Repair
Madole Construction Crews rehabilitated these stairs and the handicap ramp at Cain Hall, UNR. The concrete was starting to show signs of age (originally poured in 1971) Applying a Type III DOT epoxy and aggregate wear surface will add many years of useful life to this structure.
Cain Hall UNR
Picture of repairs completed to the handicap ramp
Closeup Concrete Repair
This picture shows a closeup of a Concrete repair to the stairs at Cain Hall
Fun In the Sun
Our guys have a lot of fun fixing structural problems Steve Anderson is flashing his mug in front of Cain Hall at UNR